New Builds
New Construction Wiring in Woodway, WA
On a new build everything can be done properly, which makes planning matter more than installation. Discuss the drawings on (000) 000-0000.
Talk it through — (000) 000-0000
Circuit counts, lighting layouts, panel position and capacity for what gets added later are nearly free at design stage and expensive afterwards. On wooded lots there is usually a second conversation about the feed to a detached garage or shop, far easier to allow for now than to trench later.
How it runs
What the job looks like
01
Take off the drawings
A proper take-off rather than an estimate.
02
Temporary power, service, rough-in
Set out for each inspection stage.
03
Trim and hand over
Everything tested, labelled and documented.
Detail
What we watch for
- Capacity allowed for later — chargers, heat pumps and shop circuits planned now
- Lighting designed room by room — switching laid out for how the room is used
- Inspection stages booked — temporary power, rough-in and final
- Panel somewhere reachable — not behind a future wardrobe
Questions
Asked often
When should we involve you?
As soon as drawings exist. Panel location, service size and circuit count cost almost nothing to decide on paper and a great deal once framing is up.
Do you handle temporary site power?
Yes, on most builds it is part of our scope, including coordinating its inspection so the other trades have power when they need it.
Have it looked at before you commit
Describe the job on the phone and we will tell you what is involved and whether it needs a visit to price properly.
Book the walkthrough — (000) 000-0000